Structural Refurbishment at Germany’s Highest Peak – Zugspitze

Location: Zugspitze, 2,962 m above sea level
Structure: Antenna and telecommunications facility (built in 1991)
Company: Hydro-Tech

Scope of Work:
Crack repair and concrete restoration on three foundations
Sealing of concrete-to-steel transitions with liquid waterproofing
Operations under high-alpine conditions

Highlights:
Germany’s highest workplace
Use of weather-resistant, extreme-condition materials
In close proximity to Germany’s highest photovoltaic system and public Wi-Fi hotspot

Region: Süden; Bauwerk: Telekommunikationsanlage; Leistung: Betoninstandsetzung, Sanierung, Abdichtungen; Unternehmen: Hydro-Tech

Floor Coating
AMG Workshop Augsburg

Client: Mercedes-Benz Branch Augsburg
Company: Hydro-Tech

Scope of Work:
Self-leveling coating applied over tiled floor
Substrate preparation (shot blasting, smoothing)
Integrated AMG logo using stencil technique
Water-based lacquer reinforced with glass beads

Highlights:
Exclusive design with slip resistance
Executed without removing the existing floor

Region: Süden; Bauwerk: Werkstätten; Leistung: Abdichtungen; Unternehmen: Hydro-Tech

Restoration
Olympic Stadium Munich

Location: Munich
Structure: Olympic Stadium (built in 1966, 70,000 seats)
Execution: 04/2010 – 12/2011
Company: Hydro-Tech

Scope of Work:
Concrete removal and reprofiling on main frame girders
Renewal of drainage channels including robotic technology
Restoration of edge beams and stair elements
Application of surface protection systems (OS-D II, OS8)

Highlights:
Work carried out during ongoing event operations
Listed historic structure
Complex scaffolding solutions

Region: Süden; Bauwerk: Stadien; Leistung: Betoninstandsetzung, Komplettinstandsetzung; Unternehmen: Hydro-Tech

Complete Renovation
Donaucenter Neu-Ulm

Location: Neu-Ulm
Building height: 55 m, 18 floors
Execution: 2023
Company: Hydro-Tech

Scope of Work:
Refurbishment of 168 balconies and loggias
Installation of 996 linear meters of window sills
5,500 m² of facade scaffolding
Disposal of 200 tons of construction debris
Installation of 45 tons of steel substructure

Highlights:
Scaffolding erected on parking garage roof with special support system
Limited crane use due to site conditions
Operations carried out during ongoing occupancy

Region: Süden; Bauwerk: Wohn- & Bürogebäude; Leistung: Sanierungen; Unternehmen: Hydro-Tech

Restoration of the Old Elbe Tunnel
– Hamburg

Location: Hamburg
Company: SGAT

Scope of Work:
Waterproofing and mastic asphalt application
Epoxy sealing and liquid waterproofing systems
Restoration of the western tunnel tube (400 meters in length)

Highlights:
Unusual surface geometry: total area approx. 800 m², length: 400 meters
Challenging material logistics due to narrow access zones and elongated layout
Precision machinery required – only 1.93 m between curbs

Region: Norden; Bauwerk: Tunnel; Leistung: Abdichtungen; Unternehmen: SGAT

Silo Restoration Buttstädt

Location: Buttstädt
Execution: 2024/25
Company: BIK Uhr

Scope of Work:
Concrete repair of the silo facade with a total surface area of 31,000 m²
Restoration of concrete damage due to insufficient concrete cover and carbonation
Corrosion protection of reinforcement using dry abrasive blasting and coating
Coating of the concrete façade
Corrosion protection of four emergency ladders made of steel structures
Application of corporate logos

Highlights:
Work at heights up to 60 meters using suspended platforms
Cylindrical geometry of the silo cells
Operations during ongoing production
Strict safety measures due to fall hazards

Region: Osten; Bauwerk: Silos; Leistung: Betoninstandsetzung, Sanierung; Unternehmen: BIK Uhr

Large-scale chloride extraction Munich

Location: Munich
Building: Office building
Execution: 08/2024-05/2025

Company: instakorr

Scope of work:
Conversion and revitalisation
Repair by electrochemical chloride extraction (ECE) for 2,190 m² area

Highlights:
Europe’s largest measure with chloride extraction
Simultaneous extraction current: 1,020 A
3 construction phases

Region: Süden; Bauwerk: Wohn- & Bürogebäude; Leistung: ECE, Komplettinstandsetzung; Unternehmen: instakorr

Complete refurbishment of underground car park Nuremberg

Location: Sebalder Höfe, Nuremberg
Building: Underground car park
Execution: 10/2020 to 09/2021
Company: instakorr

Scope of work:
Complete refurbishment of the underground car park using a cathodic corrosion protection system (CCP)
Protected areas: 816 m² floor areas

Highlights:
Execution of the construction site during the Corona pandemic
Monitor & control devices and software CAB|ONE
650 m hybrid cable
8,816 m² floor area protected by Ti/MMO grid anodes
28 protection zones
106 reference electrodes
2 levels
4 construction phases
4 Bauabschnitte

Region: Süden; Bauwerk: Tiefgaragen & Parkhäuser; Leistung: Komplettinstandsetzung, KKS; Unternehmen: instakorr

Hybrid repair with CCP Berlin

Location: Friedrichsstraße, Berlin
Building: Underground car park
Execution: 09/2022 – 09/2023
Company: instakorr

Scope of work:
Complete repair of the underground car park. Combination of conventional concrete repair by means of HDW removal and including new concreting and cathodic corrosion protection (CCP).
3,950 m² CCP on floor areas
CCP on 42 support bases
Crack sealing
Coating work
Painting work

Highlights:
Combined repair by means of concrete removal with new concreting and CCP

Region: Osten; Bauwerk: Tiefgaragen & Parkhäuser; Leistung: Komplettinstandsetzung, KKS; Unternehmen: instakorr

ECE on prestressing steel bridge Borken

Location: Borken
Structure: Road bridge over railway line
Execution: 06/2021 – 11/2021

Company: instakorr

Scope of work:
Internal, leaking drainage of the carriageway through box girder floor
Removal of penetrated chlorides by electrochemical chloride extraction (ECE)

Highlights:
Prestressed steel bridge with slack plain steel reinforcement
Very cramped conditions

Region: Westen; Bauwerk: Brücken; Leistung: ECE; Unternehmen: instakorr

Historic wholesale market with KKS protected Hamburg

Location: Hammerbrook, Hamburg
Building: Fruit and vegetable wholesale market
Execution: 05/2017 – 10/2025
Company: instakorr

Scope of work:
17 construction phases in 8 years
Europe-wide tender won
Repair work while the vegetable and wholesale market is in operation
Partial conversion into an event location
The Federal Chamber of Engineers and the Hamburg Chamber of Engineers BAU honoured the hall as a historically significant engineering structure

Region: Norden; Bauwerk: Einzelhandelshallen; Leistung: KKS; Unternehmen: instakorr

P4 PPS system of superlatives Vienna

Location: Vienna Airport, Austria
Building: P4 multi-storey car park, Austria’s largest car park
Execution: 2016-2018

Company: instakorr

Scope of work:
Installation of a cathodic corrosion protection system (CCP)
200 m² floor areas
660 m wall base areas
240 column bases
3,000 m² preventive cathodic corrosion protection (pKKS)

Highlights:
89 protection zones with 4 controllers and 16 BUS interfaces
419 reference electrodes
4,900 discrete anodes
114,000 m Ti/MMO anodes in slots
17,350 m protective current-carrying cables
5,010 m of signalling cable
50 control cabinets
10 levels
13 sections
4 ramps

Region: Süden; Bauwerk: Tiefgaragen & Parkhäuser; Leistung: KKS, Betoninstandsetzung; Unternehmen: instakorr

CCP protection for listed hyper roof shell Hamburg

Location: Alster swimming pool, Hamburg
Building: Hyper roof shell, swimming pool
Execution: 02/2021 – 07/2021
Company: instakorr

Scope of work:
Basic repair with demolition and new construction down to the hyper roof shell of the swimming pool built in 1973
Cathodic corrosion protection on over 3,255 m² on the underside of the ceiling of the listed prestressed concrete ceiling to protect against corrosion and to preserve the supporting structure

Highlights:
Hamburg’s largest swimming pool
Roof shell only 7 cm thick in places with upper and lower prestressing steel reinforcement and crosswise running prestressing steel in ducts in between
Processing of 10,300 m of cable from the hyper roof shell to the control units in the basement

Region: Norden; Bauwerk: Schwimmbäder; Leistung: Komplettinstandsetzung, KKS; Unternehmen: instakorr

Restoration of the Wankenitzbridge underside

Location: Ratzeburger Allee over the Wankenitz
Building: Wankenitzbridge underside
Execution: 07/2021 – 12/2022
Company: ABV Bau Ullrich

Scope of work:
Concrete repair
Coatings
Removal of stalactites, stalagnites and efflorescence
Tendon anchoring
Erect enclosure, work and protective scaffolding
Transport to and from pontoon system and work boats
Dismantle and rebuild bird flight protection
Set up longer-term traffic safety measures Traffic control technology
Graffiti removal
Large-scale concrete repair and application of surface protection on reinforced concrete (OS-C)

Highlights:
Work on the water
Five construction phases

Region: Norden; Bauwerk: Brücken; Leistung: Betoninstandsetzung; Unternehmen: ABV Bau Ullrich

Refurbishment of 3 underground garages Eckernförde

Location: Rendsburgerstraße, Eckernförde
Building: Underground garages
Execution: 03/2023 – 03/2024
Company: ABV Bau Ullrich

Scope of work:
Concreting and renovation of the reinforced concrete floors
Coating work on walls, columns, ceilings and floor surfaces
Concrete repair work
Concrete removal on walls, columns, ceilings and floor surfaces
Spray mortar on the underside of ceilings, walls and columns
Slope – installation of concrete/PCC incl. reinforcement and anchors
Installing drains
Installing joint profiles
Marking work
Drainage, fire protection, doors and joints
Sewer construction and drainage

Region: Norden; Bauwerk: Tiefgaragen & Parkhäuser; Leistung: Sanierungen; Unternehmen: ABV Bau Ullrich

Chloride extraction on a large scale

Location: B76 Manrade Kiel
Building: Pedestrian bridge
Execution: 07/2020 – 09/2020
Company: ABV Bau Ullrich

Scope of work:
Full closure incl. diversion
Construction of supporting, protective and working scaffolding
Prepare concrete base (grinding/milling/balling)
Concrete repair
Coating
Renewal of transverse joints
Lifting and draining the superstructure
Replace existing bridge bearings

Region: Norden; Bauwerk: Brücken; Leistung: ECE; Unternehmen: ABV Bau Ullrich

B76-B404 brige Barkauer Kreuz

Location: Kiel
Building: Bridge
Execution: 03/2023 – 03/2024
Company: ABV Bau Ullrich

Scope of work:
Concrete repair and coating under the bridge
Traffic safety
Scaffolding
Concrete repair
Coating
Piling piers and restoring with shotcrete

Region: Norden; Bauwerk: Brücken; Leistung: Betoninstandsetzung; Unternehmen: ABV Bau Ullrich

Cap renewal and pier coating

Location: A7 bridge over K75, Rendsburg
Building: Bridge
Execution: 05/2014 – 10/2014
Company: ABV Bau Ullrich

Scope of work:
Scaffolding
Replace drains
Demolish old caps
Full-surface sealing
Set shear anchors
New cap construction
Concrete repair of piers
Coat piers

Region: Norden; Bauwerk: Brücken; Leistung: Komplettinstandsetzung, Betoninstandsetzung; Unternehmen: ABV Bau Ullrich